Client
Project #HCC-01
Basement and Underground Tank Water Proofing
Client
Heart Centre Clifton , Karachi
Contractor
Crystal Coating Services
The project focuses on protecting critical infrastructure from water seepage, moisture intrusion, and long‑term structural deterioration.
The scope includes comprehensive surface preparation, crack treatment, application of high‑performance waterproofing membranes, and protective coatings designed to withstand hydrostatic pressure.
Work involves sealing all basement walls, floors, and joints, as well as fully waterproofing the underground water tank to ensure leak‑free storage and maintain water quality.
The project enhances the durability of the facility, prevents structural damage, and supports the Heart Centre’s operational reliability by creating a dry, secure, and hygienic environment.
Products used in the Project



